Pages

Friday, January 28, 2011

Bot Specs (York)

Matt setting up the next test.
Thanks to the Reidy's for buying food to feed the beasts
Holden tweaking the program.
Bot going up the bridge.
Bot scoring in rolling goal.
Holden double checking the program.
Bot testing.
Matt fixing the bot.
The "little guys" working on the bull-nose.
Bot testing.
Our baton dispensing system located at the front of the bot.
Samantha, located at the top of our bot.
Our conveyor to dispense batons.
Our battery pack located below the conveyor.
Our baton collecting spinners.
Baton dispensing setup.
Drive system.
Secondary bridge dropper at the front of the bot.
Our main bridge dropper located at the back of our bot.
Bull-nose rolling goal collecting system use to score in rolling goal.

No comments:

Post a Comment