Pages

Sunday, September 26, 2010

September 26 2010 4th meeting


People present:Grant, Sean, Scott, Andrew, Connor, Brad, Holden, Jared, Mr.Pontious, Mr.Don, Mr.Perie, James, Rick Tinker, Mr. Lanterman.
Software-Testing Samantha, all software has been installed. Testing equipment. A programed servo!
Maneuverability-Design and building of baton collector. Brainstorming. Tested combo's between brackets and poles for the spinner collector. The finalized design will be in the next post. Blueprints for baton collector.
Mobility-Building drive train. Testing field parts. 4 wheels on each side of robot.

No comments:

Post a Comment